|   [1]  Maqbool D, Nicholas C Petruzzi, Leroy B Schwarz. A Newsvendor's Procurement Problem when Suppliers Are Unreliable.  
Manufacturing & Service Operations Management, 2007, 9(1): 9--32 
[2]  Hadley G, Whitin T M. Analysis of Inventory System. Prentice-hall, Inc Eaglewood Cliffs, NJ, 1963 
[3]  Meyer R R, Rothkopf M H, Smith S A. Reliability and inventory in a production-storage system. Management Science, 1979, 25(8): 799--807 
[4]  Parthasarathy P R, Sharafali M. On the unutilizedcapacity of a production-storage system. Operations Research Letters, 1987, 6(1): 233--238 
[5]  Liu B, Cao J. Analysis of a production-inventory system with machine breakdowns and shutdowns. Computers & Operations Research,  1999, 26(2): 73--91 
[6]  Mohamadou D, Pierreval H, Quilliot A. Manufacturing cells design with fexible routing capability in presence of unreliable machines. International Journal of Production Economics, 2001, 74(1-3): 175--182 
[7]  Abboud N E. A discrete-time Markov production-inventory model with machine breakdowns. Computers & Industrial Engineering, 2001,  39(1/2): 95--107 
[8]  Giri B C, Dohi T. Optimal lot sizing for an unreliable production system based on net present value approach. International Journal of Production Economics, 2004, 92(2): 157--167 
[9]  Giri B C, Yun W Y,  Dohi T. Optimal design of unreliable production inventory systems with variable production rate. European Journal of Operational Research, 2005, 162(2): 372--386 
[10]  Hou Yumei, Sethi S P, Zhang H Q, Zhang Q. Asymptotically optimal production policies in dynamic stochastic jobshops with limited buffers. Journal of Mathematical Analysis and Applications, 2006, 317: 398--428 
[11]  Suwa H, Sandoh H. Capability of cumulative delay based reactive scheduling for job shops with machine breakdowns. Computers & Industrial Engineering, 2007, 53(1): 63--78 
[12]  Silver E A. Operations research in inventory management: a review and critique. Operations Research, 1981, 29(4): 628--645 
[13]  Parlar M, Berkin D. Future supply uncertainty in EOQ models. Naval Research Logistics, 1991, 38(2): 107--121 
[14]  Weiss H J, Rosenthal E C. Optimal ordering policies when anticipating a disruption in supply or demand. European Journal of Operational Research, 1992, 59(2): 370--382 
[15]  Parlar M, Wang D. Diversification under yield randomness in inventory models. European Journal of Operational Research, 1993, 66(1): 52--54 
[16]  Anupindi R, Akella R. Diversification under supply uncertainty. Management Science, 1993, 39(3): 944--963 
[17]  Berk E, Arreola-Risa A. Note on future uncertainty in EOQ models. Naval Research Logistics, 1994, 41(2):129--132. 
[18]  Parlar M, Perry D. Inventory models of future supply uncertainty with single and multiple suppliers. Naval Research Logistics, 1996, 43(2): 191--210 
[19]  Gupta D. The (Q,  r) inventory system with an unreliable supplier. INFOR, 1996, 34(1): 59--76 
[20]  Parlar M. Continuous-review inventory problem with random supply interruptions.  European Journal of Operational Research, 1997, 99(2): 366--385 
[21]  Parlar M. Probabilistic analysis of renewal cycles: an application to non-markovian inventory problem with multiple objectives. Operations Research, 2000, 48(2): 243--255 
[22]  Gurler U, Parlar M. An inventory problem with two randomly available suppliers. Operations Research, 1997, 45(3): 904--918 
[23]  Arreola-Risa A, DeCroix G A. Inventory management under random supply disruptions and partial backorders. Naval Research Logistics, 1998, 46(3): 687--703 
[24]  Ozekici S, Parlar M. Inventory models with unreliable suppliers in a random environment.  Annals of Operations Research, 1999, 91(2): 123--136 
[25]  Chen J, Yao D, Zheng S H. Optimal replenishment and rework with multiple unreliable supply sources. Operations Research, 2001, 49(3): 430--433 
[26]  Mohebbi E. Supply interruptions in a lost-sales inventory system with random lead time. Computers and Operations Research, 2003, 30(3): 411--426 
[27]  Mohebbi E. A replenishment model for the supply-uncertainty problem. International Journal of Production Economics, 2004, 87(1): 25--37 
[28]  Mohebbi E, Hao D.  When supplier s availability affects the replenishment lead time-An extension of the supply-interruption problem.  
European Journal of Operational Research, 2006, 175(2): 992--1008 
[29] Neuts M F. Matrix-geometric Solutions in Stochastic Models. Baltimore: Johns Hopkins University Press, 1981 
[30]  Neuts M.F. Structured Stochastic Matrices of M/G/1 Type and Their Applications. New York:Marcel Decker,1989. 
[31]  Wang Songgui, Shi Jianhong, Yin Suju, Wu Mixia. Introduction of Linear Model. Beijing: Science Press, 2004: 23 
[32]  Berman A, Plemmons R J. Nonnegative Matrices in the Mathematical Sciences. New York: Academic Press, 1979 
[33]  Shaked  M, Shanthikumar J G. Stochastic Orders and Their Applications. Boston: Academic Press, 1994 
[34]  Song J S. The Effect of Leadtime Uncertainty in a Simple Stochastic Inventory Model. Management Science, 1994, 40(2): 603--613 
[35]  Zipkin P. Foundations of Inventory Management. New York: McGraw-Hill NY, 2000 
[36]  He Q M, Jewkes E M, Buzacott J. Optimal and near-optimal inventory control policies for a make-to-order inventory-production system. European Journal of Operational Research, 2002, 141(1): 113--132 
[37]  Boute R N, Lambrecht M R, Houdt B V. Performance evaluation of a production/inventory system with periodic review and 
endogenous lead times. Naval Research Logistics, 2007, 54(2): 462--473  |